Guardrail Brace is one important part of frame scaffolding system, it provides fall protection to the people when working on the scaffold platform. Scaffold guard rail is made by dia.1.25" x 0.0787"t (O.D 32x2.0mm) pre-galvanized tube, or by black tube and then do electric galvanized, which endures hits and all kind of forces, preventing a person f1
Guardrail Brace is one important part of frame scaffolding system, it provides fall protection to the people when working on the scaffold platform. Scaffold guard rail is made by dia.1.25" x 0.0787"t (O.D 32x2.0mm) pre-galvanized tube, or by black tube and then do electric galvanized, which endures hits and all kind of forces, preventing a person f1
Guardrail Posts are set up on top of the scaffolding platform for installing guardrail braces. They provide fall protection to the people when working on the scaffold platform. Guardrail Posts are made by dia.1.65" x 0.09"t (O.D 42x2.3mm) or dia. 1.69"x0.095"t (O.D 43x2.5mm) steel tubes. They are strong engough to hold the guardrail braces.
Side brackets allow for the extension of the scaffold platform beyond the legs, usually by a multiple of plank widths. When used with frame scaffolds, the side bracket is placed at the leg and is parallel to the frame or bearer. Angle Iron Side Bracket is the kind of bracket made by angle iron, with bell hanger.
End Bracket is the type of extension bracket, used to extend the platform at the end of a scaffold run. The end bracket is also placed at the leg but is perpendicular to the frame or bearer. Tubular End Bracket is made by dia.1.65"x0.09"t (O.D 42x2.3mm) steel tube and with bell hanger or saddle hanger.
Steel plank is used as walkway plank in scaffolding system for construction safety. It is a fitting part of construction scaffolds. There are stamping holes on the scaffolding plank to resist skidding for workers. The galvanized surface and rib reinforcement design makes scaffolding plank more stronger in the rainy days and moist environment.1
Internal Stair is the stairway solutions for temporary access. 7' Bay Internal Stairs towers are constructed utilizing scaffolding frames,cross braces, guardrail brace, planks, stairs. The stair towers are set for7' scaffolding bay, and for 5', 6'4", 6'6", 6'7", 6'8" heights to meet different frame heights.
Mesh Ladders / Step Ladders / Steel Ladders / Straight Stairs are the economical stair acesses for H frames. The stair treads are made by 52x26x2.0mm steel oval tube, and the treads are made by mesh plates or punched hole plates or strip plates. They are used for 1219x1930mm H frames or cross lock scaffolding, for 1.83m or 2m scaffold bay.
2.0m Aluminum Stretcher Stairs are designed specifically for use with the traditional steel kwikstage system scaffolding. They are pre-fabricated and designed to fit in a 1.27m x 2.44m bay with a 2.0m lift. The stair ends are flat so that it can lay on the transoms. The stairs are 560mm wide with a rise of 230mm. Two stairs (lift and right stretche1
2.0m Aluminum Stretcher Stairs with Hooks are the type of stretcher stair with long u-shape hook welded at the two ends. By thehooks, the stairs can widely use for all kinds of modular scaffolding system, such as kwikstage, ring lock, cup lock scaffolding. They are pre-fabricated and designed to fit in a 1.27m x 2.44m bay with a 2.0m lift. The1
Kwikstage Stairway (Steel) is the safe & easy solution for vertical access in lightweight with non-slip treads and platform. It is fabricated and designed to fit in a 1.27x2.44m scaffolding bay with 1.5m lift height. It is a specially design to fit in 1.2m tranom for two stairs side by side installation. The stairs are hot dip galvanized.
Scaffolding Couplers are the fittings for fixing and stabilizing the steel tubular scfolding. Simple, orthogonal, sviwel,fixed couplings for worksite barrier, couplings for beams and many other types. We supply various types of BS1139 / EN74 / AS 1576 / ANSI Standard forged or pressed Double Coupler, Swivel Clamp, Beam Clamp Girder, Sleeve Coupler,1
Steel formwork is a temporary setup for storing concrete until it sets. Formworks are wide used for slabs, walls, beams, columns' concrete casting in building construction. Steel is a perfect material for making formwork because it will never bend or warp while pouring concrete. Steel formwork has the capability to store a large amount of concrete.1
Shuangma Self Climbing Scaffolding Systems is suitable for high-rise buildings and super high-rise shear wall structures. This system integrated with the climbing mechanism makes for one-time installation and lifting. Also its built-in safety screen design can effectively prevent workers and objects falling when operating.
Ring Lock Scaffolding Lattice Beams are the horizontal members that allow for scaffolding over large spans or gaps, offers suspended, walk through and beam support in Construction. Sizes of the Lattice Beams are in 10 ft to 28 ft according to construction design and 500mm depth.
Speed Shore Kwikstage scaffolding is the type of heavy duty kwiskstage system scaffold that used for concrete slab formwork solutions with sleeved standard, C-ledgers, trigger brace, solid adjustable screw jack base , forkhead jacks, rail post etc.
Kwikstage Ladder Access Transom is used where a ladder access or trapdoor is required inside a bay. The Ladder Access Transom is located between the two ledgers, this is placed approx 64" from the previous transom. To be used with a Safety Trap-Door, a single section verticle ladder is held in place with 4 nos Metal Ladder Clamp. We recommend that 1