News - China Scaffolding and Fromwork Factory
  • Notice on Employee Resignation
    View More
    Notice on Employee Resignation
    Notice on Employee Resignation Date: 16 August 2021 Dear Customers, We hereby declare that, Ms. Zhu Yangjian (Jenny Zhu), the former employee of the Sales Department of our company, has resigned. We solemnly declare that all her business activities outside of our company since the date of promulgation of this statement are personal acts and have nothing to do with us, If there is any behavior of her that affects the interests and/or reputation of our company, we will investigate the legal responsibility. Thank you for your continued support! Best regards Guangzhou Shuangma Steel Template Co.,Ltd No.33, Xiaxin Alley, Xiafu Road, Zhongxin Town, Zengcheng District, Guangzhou, Guangdong, China Tel: +86-20-82860460, 82860461, 82860462 Official Website: http://www.gzshuangma.com
    2021-08-16 View More
  • Seminar Held on 18 July to Discuss About Self-climbing Scaffolding Industry
    View More
    Seminar Held on 18 July to Discuss About Self-climbing Scaffolding Industry
    China Construction Materials Rental Contractor Association and its Quality and Safety Standardization Branch organized a seminar on key enterprises in the protection platform (self-climbing scaffolding) industry at Guangzhou Shuangma Steel Template Co., Ltd. on July 18, 2020. More than 50 business leaders from the key companies attended the meeting to conduct in-depth discussions on industry development trends and problems faced by the industry!
    2020-07-18 View More
  • Maintenance Matters During the Erection of Scaffolding
    View More
    Maintenance Matters During the Erection of Scaffolding
    Maintenance Measures During the Erection of Ring Lock System Scaffolding 1. Protective matters in the process of setting up and using scaffolding a. The completed scaffolding system should be set up to inspect the structure of the scaffolding every day to check whether the uprights and walkway panels are sinking or loose. Are some components intact? b. The base of the scaffold should be drained well. After each rain, the base of the scaffold should be fully inspected to prevent the base of the scaffold from sinking.  c. The construction load of the operation layer of the scaffolding shall not exceed 270 kg/m2. It is not allowed to fix the cross bar support, cable wind rope, etc. on the scaffolding, and prevent heavy objects from hanging on the scaffolding rack body. d. Set up the completed scaffolding system to prevent anyone from unintentionally removing any parts on the scaffolding. e. When encountering the strong wind, heavy fog, heavy rain and heavy snow climate of level 6 or above, the work of the scaffold should be suspended immediately. Before resuming work, it is necessary to check that the scaffold has been installed and there is no problem before continuing to work. 2. Matters needing attention when using scaffolding a. It is forbidden to mix the use of steel pipes and corrugated pipes with outer diameters of 48mm and 51mm for scaffolding. b. At the main node of the scaffold, the distance between the center line of the fastening horizontal horizontal rod or vertical horizontal rod, scissors support, horizontal support and other fasteners is not more than 150mm from the main node. c. The length of the end of each rod of the scaffold protruding from the edge of the fastener cover is not less than 140mm. d. The opening of the docking fasteners should face the inside of the shelf, the bolts should face upwards, and the opening of the right-angle fasteners should not face downwards to ensure safety. e. It is necessary for all staff on the shelves to hold a certificate, wear a safety helmet and fasten a seat belt. f. It is necessary for all staff on the shelves to strictly follow the construction plan; g. During the installation, even the wall pieces and scissors support should be set in time, and no more than two steps behind. h. During the installation process, the straightness of the scaffold should be adjusted to allow a deviation of 100mm.
    Jul 1,2020. View More
  • Self-climbing Scaffolding is Busy in the Factory
    View More
    Self-climbing Scaffolding is Busy in the Factory
    Thanks for the hard-working of our people, the factory is full running every day since from March 2020. Our production for scaffolding has been up to 1000tons/month. Still we need to add more production volume so as to satisfy customers' demand.
    Jun 18,2020. View More
  • Hello 2020! New Journey, New Progress!
    View More
    Hello 2020! New Journey, New Progress!
    Shuangma New Year's Greeting Party 11 January 2020, a special day for Shuangma family members, a New Year's Greeting Party was held to review the past working and achievements, recognise the advanced persons, and set up new target for 2020. The General Manager said that in the past year 2019, thank to all Shuangma members, we made great progress in scaffolding and formwork sales, scaffolding rental, and construction services, especially for self-climbing scaffolding system which was widely used in China's highrise building construction. However, there will be great challenge and difficulty also in year 2020, we need to roll-up-sleeve to work harder. In the party, the Chairman expressed new year festival greetings to all staffs, gave rewards to the advanced individuals and encouraged all staffs to make greater achievement for better life.  
    2020-01-11 View More
  • Shuangma's New Powder Coating Production Line Start Running!
    View More
    Shuangma's New Powder Coating Production Line Start Running!
    By months preparation, Shuangma's new powder coating production line was completely built up and started service on 28 April 2020. Powder coating is the economical, high efficient and environmental surface treatment for scaffolding and related construction materials.
    2020-04-28 View More

A total of 1pages

how can we help you
You can contact us any way that is convenient for you. We are available 24/7 via email or telephone.
Contact Us

Home

Production

News

contact