The Use of Ring Lock Scaffolding Shoring System Jul 1,2020

Use of Ring Lock Scaffolding Shoring System:

1. It is strictly forbidden to pile up any overweight materials on the scaffold.

2. The working height on the scaffold is limited to normal operations. It is forbidden to add any super-high objects on the scaffold in any way.

3. The operator shall not arbitrarily dismantle the basic components of the scaffold, integral rods, connectors, protective measures, etc. If it is indeed necessary to temporarily dismantle the operation, it must be removed by a professional after the technical department agrees, and it shall be reinforced accordingly according to the requirements, and shall be restored after the completion of the operation.

4. Before starting each construction, the scaffolding in the construction area must be inspected, problems are raised in time, and hidden dangers are eliminated by professionals. After confirming that there are no safety hazards, construction work can be continued.

5. After the daily work on the rack is completed, the movable objects on the working surface must be cleaned to prevent the moving objects from falling. It is strictly forbidden to throw or discard anything from the scaffolding for any reason.

6. There must not be any overloaded construction work on the scaffolding. If overloaded work is required, it must be approved by the technical department and signed before the construction work.