Safety technical measures of the scaffolding manufacturers:
1. The scaffold should be demolished after confirming and signing the demolition permission order by the person in charge of the unit.
2. Before dismantling the scaffold, special personnel should be sent to check whether the materials and debris on the scaffold are cleaned. Before removing the scaffold, a safety zone must be marked and a warning sign should be set.
Send a special person to be vigilant. No other personnel are allowed to work under the frame when it is removed.
3. The order of scaffolding removal should follow the principle of dismantling first and then dismantling first. Starting from the top layer, proceeding downwards layer by layer, it is strictly prohibited to dismantle up and down at the same time, and throwing is strictly prohibited.
4. The dismantled scaffolding rods and accessories are dismantled, sorted, packed, transported and loaded layer by layer in a safe manner, and protect the safety of items on site.
Do a good job of coordination and cooperation during demolition, and it is forbidden to dismantle heavy rods and accessories alone.
5. When the scaffold is removed, in order to maintain the stability of the frame, the height and width ratio of the removed indwelling section must not be greater than 3:1, and each rod removed uses a safety rope and safety hook.
Place it on the ground and never throw it. In each step, the diagonal bar must be removed first, by the horizontal bar, the vertical bar and so on.